Enviroshield shield emblem
Follow Enviroshield
Fitness First Canary Wharf case study

Rooftop External Services Insulation & Cladding at Fitness First, Canary Wharf

Enviroshield successfully completed the insulation and cladding of large rooftop external services at a prominent Fitness First facility in Canary Wharf, London.

Canary Wharf commercial insulation case study image

This project involved enhancing the energy efficiency and weather protection of critical HVAC ductwork situated on the rooftop of a busy gym in a prime London location.

Project Overview

Our team provided comprehensive thermal insulation and protective cladding for extensive external ductwork, vital for maintaining system performance.

Canary Wharf case study overview image

Project Challenges:

Working on a busy rooftop in a dense urban environment required careful planning and execution to minimise disruption to operations.

Project Solutions:

Enviroshield implemented a high-performance insulation system with durable external cladding, ensuring longevity and optimal thermal efficiency for the client.

Delivery Approach

Our systematic approach ensured a safe, efficient, and high-quality installation, meeting the client's specific requirements and project deadlines.

Canary Wharf case study delivery approach image

Detailed Assessment

A thorough site assessment determined the specific insulation and cladding needs for the extensive rooftop ductwork and plant room services.

Expert Installation

Our experienced technicians applied the chosen insulation materials and robust external cladding with precision and adherence to safety protocols.

Durable Finish

The project was completed to a high standard, providing a durable, weather-resistant, and aesthetically pleasing finish that blends with the urban environment.

Planning something similar?

Send drawings, service photos or a short project brief and Enviroshield can advise on insulation, cladding, jackets or trace heating support.